实习报告英语版

时间:2021-04-13 10:52:50 实习报告范文 我要投稿

实习报告范文英语版

  实习是我们脱离大学之前的一次珍贵演习,正确地认识自己。以下是小编为大家整理的实习报告范文英语版。

实习报告范文英语版

  范文一

  Graduation report

  Graduation practice is to complete the final phase of the university's course to be the most important section of the Practice. Practice is every qualified students must havean experience that allows us to enhance professionalism in the practice of awarenessand practice of awareness. We practice during the process of training units in theschool and support, more guidance of experts, through training we learned a lot in class, not simply the knowledge of school for our future design and lay a solid foundation. At the same time allow themselves to contact the school for the purpose ofinternship training of our ability, the five-week internship to increase their ability to havea lot of knowledge, greatly improved.

  Graduation purpose

  Internship is designed to improve the ability of students and social contacts and to understand and master, verify and consolidate learned basic course content. Enable students to understand the modern high-rise building design and the actual construction of electrical easy to ignore the problem, students integrate theory with practice, love the professional, enthusiastic, committed to thinking of China's modernization drive.

  Graduation content

  To achieve the above objective practice, practice the main content should include:

  1. Understand the internship process and production organization of productionmanagement.

  2. Understand the performance of some electrical products and features.

  3. Control low-voltage distribution system design, weak part of the design, lighting,part of the design, dynamic part of the design, lightning protection and grounding part of the design.

  4. Institute of electrical equipment used in operating methods and the basic working principle.

  Although this practice is only 3 weeks time, but during that time, the theory for somecommon things, with perceptual awareness, feel benefit.

  Here are some of my summary of the internship period, and their feelings and experiences. To carry out their work in the future, and the future work of great help tome.

  Visit the West Campus, Dongsheng Building and City Hall and linear low-voltagepower distribution room, and the laying of the roof there are weaknesses in the design of some of mine. Now I will explain in detail the building of the lightning protection and grounding

  1. Basic principles:

  Lightning protection design of technical measures should be the existing national standard "lightning protection design of buildings" for Lightning Protection, refer to "Building Lightning Protection Design Standard" corresponding requirements, the use of ball lightning rod protection method, the use of other potential join the most important safety measures.

  2. Anti-cloud-to-measure, should meet the following requirements:

  (1) air terminals using the lightning rod, lightning protection zone (network), or a combination of both, it should be used as a metal roof building air terminals, but should be consistent with regulatory requirements. Containing radioactive material should not be used air terminals. The elimination of other forms of lightning, it should only be used with high pole tower roof was added to our building on. Protrusions on the roof, such as satellite and receiver antenna, holiday lights, aviation obstruction lights and air-cooled unit, the roof should be in the range of lightning protection devices, if not calculated by ball within the scope of protection should be separate lightning rod, with protection, lightning protection device connected with the roof.

  (2) deflectors should give priority to the use of reinforced concrete building columns or shear walls in the main bar, but also should use the building on fire ladders, steel columns, metal chimneys, etc., as deflectors.

  When the use of steel in reinforced concrete columns, steel columns as a natural drop, and also used as a grounding device based steel with no disconnect card, but it should be located in a number of suitable locations outside the bar connected with the column connecting plate, for the measurement, an external artificial grounding and equipotential bonding for use.

  Brick buildings surrounded by a separate deflectors in the external walls and the installation of 1.8 meters from the ground disconnected card. The 1.7 meters to 0.3 meters underground for some protective measures should be taken.

  (3) The use of grounding devices should give priority to the building of reinforced concrete base. A reinforced concrete ground beam, should in the beam reinforced with a ring grounding device; not reinforced concrete ground beam, it can not in the building surrounding strip of reinforced concrete base closed, galvanized flat steel with a direct lay-40x4 pit in the outer groove to form a circular grounding.